Jenn and I will be without kitchen, or kitchen sink this week. We do have a stove, microwave and refrigerator, and paper plates and utensils, so I think we'll be ok. This weekend is the big day(s) with plans to start and hopefully complete the majority of the installation. I'll keep everyone posted! Enjoy!
Monday, March 30, 2009
Here we are, another week, another kitchen update. This blog is starting to feel like my kitchen update blog. Oh well. Yesterday, Jake, Joe and I worked to take out the kitchen cabinets, the last major demo step!, and then we replaced a piece of the sub-floor that had to much give and was rotten. We also added a 1x6 and a some 3/4" plywood to the wall to assist in the installation of the cabinets this coming weekend. And finally, we prepped the drywall (cut) to be put up after the plumbing and electric are all squared away.
Another Kitchen Update
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment